通用banner

contact us

Suzhou Zhongtuo Automation Technology Co., Ltd.

Telephone:18115676640

Telephone:0512-65856806

Web site:www.sz-zht.com

Location:No. 7 Shangxin Road, Wuzhong District, Suzhou City, Jiangsu Province

Some tips on the operation of bead cold press

2021-03-16
second

Preparation before operation of the bead cold press:


1. Pick up and clean the machine (including the glue on the light board) and the workplace;


2. Check whether there is oil leakage in the oil bed and oil circuit;


3. Check whether the circulation switch of the oil pump is turned on;

Beaded cold press

4. Prepare information and auxiliary materials (pad, paper, etc.).


Operation procedure of cold press:


1. First use a feather duster to clean the dust on the surface of the workpiece, if there is oil, it needs to be cleaned, and then apply a uniform urea-formaldehyde glue


2. Cover the glued workpiece with thin wood and put it into the cold press;


3. For each type of standard board, self-inspection is necessary, whether the kanban is shifted, and whether the glue is strong or not;


4. At the end of the operation, cut off the power supply and clean up the remaining materials.


Precautions for cold press:


1. Operators need to be drilled and qualified before taking up their posts. Non-local operators are not allowed to operate the machine;


2. Keep the press clean and uniform;


3. Keep the oil circuit switch in the open state;


4. During the lifting process of the press, it is forbidden to reach into the press;


5. The press after use should be kept closed.


The shutdown of the cold press is generally divided into the following situations:


1. Shutdown between meals: Special personnel are required to be on duty.


2. One-shift shutdown: The equipment is required to block the main power supply when it is not operating.


3. Holiday shutdown: The equipment blocks the main power supply when it is not operating. If the temperature is below 0 degrees, it may be necessary to drain the water accumulated in the equipment to prevent frost damage to the equipment parts, and to perform maintenance after the shutdown. Check it every 15 days Whether to maintain once.


4. Long-term downtime: the maintenance of non-working conditions should be operated according to the above technique, so that the equipment will not be damaged in the natural environment.



label

Recent browsing: